AJO POWER BANK (1442)

AJO POWER BANK is a 120.0 MW battery interconnection project in Santa Clara, California with a current status of active. It is proposed to connect at Llagas-Gilroy Foods 115 kV line.

120.0 MWCapacity
ActiveStatus
NorthernMarket
BatteryTechnology

Project facts

Canonical nameAJO POWER BANK
Queue ID1442
Statusactive
Source statusACTIVE
MarketNorthern
TechnologyBattery
Capacity120.0 MW
StateCalifornia
CountySanta Clara
Point of interconnectionLlagas-Gilroy Foods 115 kV line
Requested (queue) date2018-04-16
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata