AL Queue Project TC25-059 — Solar in Madison, Alabama
AL Queue Project TC25-059 — Solar in Madison, Alabama is a 110.0 MW solar interconnection project in Madison, Alabama with a current status of active. It is proposed to connect at Limestone 161kV Substation.
110.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology
Project facts
| Canonical name | AL Queue Project TC25-059 — Solar in Madison, Alabama |
|---|---|
| Queue ID | TC25-059 |
| Status | active |
| Source status | Cluster Study |
| Market | AL |
| Technology | Solar |
| Capacity | 110.0 MW |
| State | Alabama |
| County | Madison |
| Point of interconnection | Limestone 161kV Substation |
| Requested (queue) date | 2024-10-01 |
| Proposed in-service date | 2027-04-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-24 | poi_name | Limestone 161kV Bus | Limestone 161kV Substation | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.