Madison County, Alabama — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Madison, Alabama, representing 263 MW of requested capacity.
5Total projects
2Active
3Operational
0Withdrawn
263 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 262 MW |
| Battery | 1 | 1 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| AL Queue Project TC25-059 — Solar in Madison, Alabama | TC25-059 | Solar | 110.0 MW | active | Madison, Alabama |
| Southeast Queue Project 662 — Solar in Madison, Alabama | 662 | Solar | 110.0 MW | active | Madison, Alabama |
| TAI Huntsville Solar Hybrid | 67488_PV1 | Solar | 32.4 MW | operational | Madison, Alabama |
| Redstone Arsenal Hybrid | 61901_REDST | Solar | 10.0 MW | operational | Madison, Alabama |
| Redstone Arsenal Hybrid | 61901_BA | Battery | 1.0 MW | operational | Madison, Alabama |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Madison County.
Start tracking with interXdata