Albatross BESS 2 (25INR0579)

Albatross BESS 2 is a 159.6 MW other interconnection project in McLennan, Texas with a current status of operational. It is proposed to connect at Tap 138kV 165 Windsor Switch - 161 McGregor.

159.6 MWCapacity
OperationalStatus
McLennanMarket
OtherTechnology

Project facts

Canonical nameAlbatross BESS 2
Queue ID25INR0579
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketMcLennan
TechnologyOther
Capacity159.6 MW
StateTexas
CountyMcLennan
Point of interconnectionTap 138kV 165 Windsor Switch - 161 McGregor
Requested (queue) date2024-02-27
Proposed in-service date
Operational date2028-02-22
Withdrawn date
DeveloperAlbatross Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata