Albatross BESS (25INR0071)

Albatross BESS is a 50.4 MW other interconnection project in McLennan, Texas with a current status of operational. It is proposed to connect at From Bus #165 Windsor Switch To Bus #161 McGregor.

50.4 MWCapacity
OperationalStatus
McLennanMarket
OtherTechnology

Project facts

Canonical nameAlbatross BESS
Queue ID25INR0071
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketMcLennan
TechnologyOther
Capacity50.4 MW
StateTexas
CountyMcLennan
Point of interconnectionFrom Bus #165 Windsor Switch To Bus #161 McGregor
Requested (queue) date2022-05-16
Proposed in-service date
Operational date2028-02-22
Withdrawn date
DeveloperAlbatross Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata