Albright-Cross School 138 kV (AC2-021)

Albright-Cross School 138 kV is a 15.0 MW other interconnection project in Garrett, Maryland with a current status of withdrawn.

15.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameAlbright-Cross School 138 kV
Queue IDAC2-021
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity15.0 MW
StateMaryland
CountyGarrett
Point of interconnection
Requested (queue) date2017-01-25
Proposed in-service date2019-01-15
Operational date
Withdrawn date2020-09-09
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.