APS — Interconnection Queue Projects

APS is associated with 779 tracked interconnection projects representing 71,317 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

779Projects
51Active
109Operational
612Withdrawn
71,317 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas13235,516 MW
Solar38515,245 MW
Other897,159 MW
Wind956,662 MW
Battery716,075 MW
Solar+Battery6645 MW
Hydro114 MW

Portfolio by market

MarketProjects
PJM56

Geographic footprint

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Flint Run 500 kVAG2-582 - moved to TC2Gas2,100.0 MWactiveDoddridge, West Virginia
PJM Queue Project AG2-582 — Gas in Doddridge, West VirginiaAG2-582Gas2,100.0 MWactiveDoddridge, West Virginia
Hatfield 500kVAA1-070Other1,710.0 MWwithdrawnGreene, Pennsylvania
Taylorstown 500 kVE17_W26Gas1,595.0 MWwithdrawnUnknown, Pennsylvania
Belmont-Harrison 500 kVAE2-167Gas1,335.0 MWwithdrawnDoddridge, West Virginia
North Longview 500 kVAE1-105Gas1,270.0 MWactivePreston, West Virginia
Cabot-Keystone 500kVAC2-118Gas1,200.0 MWwithdrawnArmstrong, Pennsylvania
White Oak 500 kVF05_W38Gas1,200.0 MWwithdrawnUnknown, Pennsylvania
Hatfield 500kVAC2-025Gas1,140.0 MWwithdrawnGreene, Pennsylvania
Hatfield 500kVAC1-097Gas1,140.0 MWwithdrawnGreene, Pennsylvania
Rhodes Lane 500kVY2-080Gas1,065.0 MWwithdrawnWestmoreland, Pennsylvania
Wylie Ridge 500kVAB1-069Gas1,025.0 MWwithdrawnWashington, Pennsylvania
Yukon-Hatfield 500kVT174Gas930.0 MWoperationalWestmoreland, Pennsylvania
Masontown 500kVT128Other700.0 MWwithdrawnFayette, Pennsylvania
Tidd-Wylie Ridge 345kVAA2-121Gas685.0 MWwithdrawnBrooke, West Virginia
Doubs 500 kV or 230 kVG00_W39Gas668.0 MWwithdrawnFrederick, Maryland
Belmont-Harrison 500 kV IIAE2-168Gas665.0 MWwithdrawnDoddridge, West Virginia
Smith-N. Fayette 138kVZ2-064Gas651.0 MWwithdrawnWashington, Pennsylvania
Yukon 500 kVE17_W29Gas640.0 MWwithdrawnWestmoreland, Pennsylvania
Eastalco 230 kVG51_W62Gas640.0 MWwithdrawnFrederick, Maryland
RoncoE17_W27Gas620.0 MWoperationalFayette, Pennsylvania
Doubs 500 kV or 230 kVE05_W25Gas620.0 MWwithdrawnFrederick, Maryland
Ft. Martin 500kVN45Other600.0 MWwithdrawnMonongalia, West Virginia
Fort Martin 500 kVG30_W51Other600.0 MWoperationalMonongalia, West Virginia
South Bend 500 kVB12_W01Gas600.0 MWoperationalArmstrong, Pennsylvania
PJM Queue Project AH1-759 — Battery in Montgomery, MarylandAH1-759Battery600.0 MWwithdrawnMontgomery, Maryland
Morrisville 500kVR77Gas600.0 MWwithdrawnWarren, Virginia
Springdale 138kVV1-013Other580.0 MWwithdrawnAllegheny, Pennsylvania
Glen Falls 138kVAA2-119Gas550.0 MWactiveHarrison, West Virginia
Yukon-Robbins 138kVAA2-161Gas541.0 MWwithdrawnAllegheny, Pennsylvania
Springdale 138 kVB18_W03Gas525.0 MWoperationalAllegheny, Pennsylvania
Gates Hill 138 kVG51_W61Gas525.0 MWwithdrawnFayette, Pennsylvania
Hatfield Ferry 500 kVG51_W60Other525.0 MWwithdrawnGreene, Pennsylvania
Hatfield 500 kVL10Other520.0 MWwithdrawnGreene, Pennsylvania
Hatfield 500kVAA2-173Gas515.0 MWoperationalGreene, Pennsylvania
Kempton 500 kVG30_W55Gas500.0 MWwithdrawnUnknown, Maryland
Enon 138 kVH14_W67Gas500.0 MWwithdrawnUnknown, Pennsylvania
Fort Martin 500 kVG06_W44Gas500.0 MWwithdrawnMonongalia, West Virginia
Harrison 500 kVG06_W45Gas500.0 MWwithdrawnHarrison, West Virginia
Black Oak 500 kVG06_W47Gas500.0 MWwithdrawnAllegheny, Pennsylvania
Willow IslandZ1-049Gas464.0 MWwithdrawnPleasants, West Virginia
RivesvilleZ1-048Gas464.0 MWwithdrawnMarion, West Virginia
Tallmansville 138 kVG02_W43Gas450.0 MWwithdrawnUpshur, West Virginia
Greenland Gap 500 kVAI1-202Solar450.0 MWwithdrawnGrant, West Virginia
Friendsville 500 kVD05_W17Gas432.0 MWwithdrawnGarrett, Maryland
South Bend 500kVAD2-114Gas410.0 MWwithdrawnArmstrong, Pennsylvania
South Bend 500kVU4-032Gas400.0 MWwithdrawnArmstrong, Pennsylvania
McConnellsburg-Cherry Run 138 kVH27_W72Gas350.0 MWwithdrawnFulton, Pennsylvania
PJM Queue Project AH1-743 — Gas in Shenandoah, VirginiaAH1-743Gas333.8 MWwithdrawnShenandoah, Virginia
McConnellsburg-Guilford 138kVAA1-045Gas308.0 MWwithdrawnVenango, Pennsylvania
Oak Grove 138 kVB12_W02Gas300.0 MWoperationalPleasants, West Virginia
Black Oak-Hatfield 500 kVAG1-363Solar300.0 MWactiveGarrett, Maryland
North Longview 500 kVAI2-443Solar300.0 MWwithdrawnGreene, Pennsylvania
Greenland Gap 500kVH21_W68Wind300.0 MWoperationalGrant, West Virginia
Windsor 138 kVH08_W66Gas300.0 MWwithdrawnUnknown, West Virginia
Karthaus 230kVL19Other290.0 MWwithdrawnClearfield, Pennsylvania
PJM Queue Project AH1-734 — Gas in Indiana, PennsylvaniaAH1-734Gas270.3 MWactiveIndiana, Pennsylvania
South Bend 500 kVAH1-734 - moved to TC2Gas270.3 MWactiveIndiana, Pennsylvania
Warren 138 kVG00_W40Gas264.0 MWwithdrawnWarren, Virginia
McConnellsburg-Guilford 138 kVH27_W71Gas252.0 MWwithdrawnFulton, Pennsylvania
Bath County 500kVI09Other252.0 MWwithdrawnBath, Virginia
Armstrong Battery StorageAH1-566Battery250.0 MWwithdrawnArmstrong, Pennsylvania
Cowen 138kVAH1-625Solar250.0 MWwithdrawnWebster, West Virginia
PJM Queue Project AG2-404 — Solar in Hardy, West VirginiaAG2-404Solar250.0 MWwithdrawnHardy, West Virginia
Ridgway - Elko 138 kVAI1-040Solar250.0 MWwithdrawnElk, Pennsylvania
Springdale 138kVAH1-562 - moved to TC2Battery250.0 MWwithdrawnAllegheny, Pennsylvania
South Bend 500kVAH1-566 - moved to TC2Battery250.0 MWwithdrawnArmstrong, Pennsylvania
Springdale Battery Storage IIAH1-562Battery250.0 MWwithdrawnAllegheny, Pennsylvania
Meadow Brook - Mt. Storm 500 kV IIAG2-404 - moved to TC2Solar250.0 MWwithdrawnHardy, West Virginia
Greeland Gap 500 kV IVAH1-256Battery240.0 MWwithdrawnGrant, West Virginia
Mount Storm Repower BESS 1AH1-255Battery240.0 MWwithdrawnGrant, West Virginia
Greenland Gap IIIAH1-255 - moved to TC2Battery240.0 MWwithdrawnGrant, West Virginia
Imperial-Joffre 138 kVAG1-527Solar215.0 MWwithdrawnAllegheny, Pennsylvania
Powell Mountain 138 kVAG2-686Solar215.0 MWwithdrawnNicholas, West Virginia
PJM Queue Project AG2-658 — Solar in Webster, West VirginiaAG2-658Solar210.0 MWwithdrawnWebster, West Virginia
Cowen 138 kVAG2-658 - moved to TC2Solar210.0 MWwithdrawnWebster, West Virginia
Moshannon-Milesburg 230 kV IVAF1-142 - moved to TC1Solar202.4 MWwithdrawnClearfield, Pennsylvania
PJM Queue Project AF1-142 — Solar+Battery in Clearfield, PennsylvaniaAF1-142Solar+Battery202.4 MWwithdrawnClearfield, Pennsylvania
Mount Storm-Pruntytown 500kVAH1-283 - moved to TC2Solar200.0 MWactiveGarrett, Maryland
Pickens 138kVV3-027Wind200.0 MWwithdrawnWebster, West Virginia

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through APS.