Albright-Cross School 138kV (AA2-020)

Albright-Cross School 138kV is a 15.0 MW other interconnection project in Garrett, Maryland with a current status of withdrawn.

15.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameAlbright-Cross School 138kV
Queue IDAA2-020
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity15.0 MW
StateMaryland
CountyGarrett
Point of interconnection
Requested (queue) date2014-12-05
Proposed in-service date2017-05-30
Operational date
Withdrawn date2015-10-29
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata