ALEXANDRIA - BISON 345.0kV is a 343.0 MW generation interconnection project with a current status of operational. It is proposed to connect at ALEXANDRIA - BISON 345.0kV.

343.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology

Project facts

Canonical nameALEXANDRIA - BISON 345.0kV
Queue IDJ4366
Statusoperational
Source statusActive
Market—
TechnologyGeneration
Capacity343.0 MW
State—
CountyClay
Point of interconnectionALEXANDRIA - BISON 345.0kV
Requested (queue) date2026-09-12
Proposed in-service date2031-11-30
Operational date2031-11-30
Withdrawn date—
Developer—
Utility / transmission ownerMISSOURI RIVER ENERGY SERVICES - TRANSMISSION

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-21new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata