MISSOURI RIVER ENERGY SERVICES - TRANSMISSION — Interconnection Queue Projects
MISSOURI RIVER ENERGY SERVICES - TRANSMISSION is associated with 9 tracked interconnection projects representing 2,126 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
9Projects
0Active
5Operational
4Withdrawn
2,126 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 686 MW |
| Wind | 2 | 589 MW |
| Battery | 2 | 461 MW |
| Solar | 3 | 390 MW |
Geographic footprint
| State | Projects |
|---|---|
| Minnesota | 5 |
| North Dakota | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Alexandria 345kV | J2606 | Battery | 361.0 MW | withdrawn | Steele, North Dakota |
| ALEXANDRIA - BISON 345.0kV | J4335 | — | 343.0 MW | operational | Clay, — |
| ALEXANDRIA - BISON 345.0kV | J4366 | — | 343.0 MW | operational | Clay, — |
| ALEXANDRIA 345 KV | J2605 | Wind | 339.0 MW | withdrawn | Steele, North Dakota |
| Other_ | J3326 | Wind | 250.0 MW | operational | Lyon, Minnesota |
| Willmar | J3434 | Solar | 200.0 MW | operational | Kandiyohi, Minnesota |
| Alexandria 345 kV Substation | J1108 | Solar | 150.0 MW | withdrawn | Douglas County, Minnesota |
| Fergus Falls MRES/WMMPA | J3778 | Battery | 100.0 MW | withdrawn | Otter Tail, Minnesota |
| ALEXANDRIA | J2276 | Solar | 39.5 MW | operational | Douglas, Minnesota |
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-10-31 | Alexandria 345kV | phase | Phase 2 | Phase 3 |
| 2026-10-31 | ALEXANDRIA 345 KV | phase | Phase 2 | Phase 3 |
| 2026-10-21 | ALEXANDRIA - BISON 345.0kV | new_project | — | operational |
| 2026-10-14 | ALEXANDRIA 345 KV | phase | Phase 1 | Phase 2 |
| 2026-10-14 | Alexandria 345kV | phase | Phase 1 | Phase 2 |
| 2026-10-11 | ALEXANDRIA - BISON 345.0kV | new_project | — | operational |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.