Alisa Solar Energy Complex 2 (2207)

Alisa Solar Energy Complex 2 is a 500.0 MW solar+battery interconnection project in Yuma, Arizona with a current status of active. It is proposed to connect at NORTH GILA - HOODOO WASH (SDGE Portion Only).

500.0 MWCapacity
ActiveStatus
CAISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameAlisa Solar Energy Complex 2
Queue ID2207
Statusactive
Source statusactive
MarketCAISO
TechnologySolar+Battery
Capacity500.0 MW
StateArizona
CountyYuma
Point of interconnectionNORTH GILA - HOODOO WASH (SDGE Portion Only)
Requested (queue) date2023-04-17
Proposed in-service date2030-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata