Alkali Creek Wind 2 (28INR0478)

Alkali Creek Wind 2 is a 250.3 MW other interconnection project in Fisher, Texas with a current status of operational. It is proposed to connect at Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road.

250.3 MWCapacity
OperationalStatus
FisherMarket
OtherTechnology

Project facts

Canonical nameAlkali Creek Wind 2
Queue ID28INR0478
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFisher
TechnologyOther
Capacity250.3 MW
StateTexas
CountyFisher
Point of interconnectionTap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road
Requested (queue) date2025-12-17
Proposed in-service date
Operational date2028-12-01
Withdrawn date
DeveloperAlkali Creek Wind, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata