Allegany 2 Battery 2 (1128)

Allegany 2 Battery 2 is a 20.0 MW battery interconnection project in Allegany, New York with a current status of withdrawn. It is proposed to connect at Andover-Palmeter 115 kV Line 101990.

20.0 MWCapacity
WithdrawnStatus
CMarket
BatteryTechnology

Project facts

Canonical nameAllegany 2 Battery 2
Queue ID1128
Statuswithdrawn
Source status0
MarketC
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyAllegany
Point of interconnectionAndover-Palmeter 115 kV Line 101990
Requested (queue) date2021-01-21
Proposed in-service date2023-01-31
Operational date
Withdrawn date
DeveloperNorthland Power U.S. Projects
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata