Allen Junction-Lyons 138kV (W3-059B_AT7)

Allen Junction-Lyons 138kV is a 97.6 MW wind interconnection project in Fulton, Ohio with a current status of withdrawn.

97.6 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameAllen Junction-Lyons 138kV
Queue IDW3-059B_AT7
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity97.6 MW
StateOhio
CountyFulton
Point of interconnection—
Requested (queue) date2010-09-10
Proposed in-service date2010-12-31
Operational date—
Withdrawn date2012-02-02
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata