ALLIUM HYBRID (1921)

ALLIUM HYBRID is a 110.0 MW solar+battery interconnection project in San Benito, California with a current status of active. It is proposed to connect at Crazy Horse Canyon-Hollister 115 kV Line.

110.0 MWCapacity
ActiveStatus
GBAMarket
Solar+BatteryTechnology

Project facts

Canonical nameALLIUM HYBRID
Queue ID1921
Statusactive
Source statusACTIVE
MarketGBA
TechnologySolar+Battery
Capacity110.0 MW
StateCalifornia
CountySan Benito
Point of interconnectionCrazy Horse Canyon-Hollister 115 kV Line
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.