Alpha Digital Campus Combined-cycle and Co-located Load (28INR0499)
Alpha Digital Campus Combined-cycle and Co-located Load is a 58.3 MW gas interconnection project in Reeves, Texas with a current status of active. It is proposed to connect at 38044 TNCOWPEN__3 345kV.
58.3 MWCapacity
ActiveStatus
ReevesMarket
GasTechnology
Project facts
| Canonical name | Alpha Digital Campus Combined-cycle and Co-located Load |
|---|---|
| Queue ID | 28INR0499 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Reeves |
| Technology | Gas |
| Capacity | 58.3 MW |
| State | Texas |
| County | Reeves |
| Point of interconnection | 38044 TNCOWPEN__3 345kV |
| Requested (queue) date | 2026-04-28 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | PowerBridge LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata