Altair Energy Storage (28INR0321)

Altair Energy Storage is a 201.8 MW other interconnection project in Colorado, Texas with a current status of operational. It is proposed to connect at Tap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520).

201.8 MWCapacity
OperationalStatus
ColoradoMarket
OtherTechnology

Project facts

Canonical nameAltair Energy Storage
Queue ID28INR0321
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketColorado
TechnologyOther
Capacity201.8 MW
StateTexas
CountyColorado
Point of interconnectionTap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520)
Requested (queue) date2025-04-21
Proposed in-service date
Operational date2030-03-31
Withdrawn date
DeveloperAltair Energy Storage
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.