Altamaha Green Energy (GI-195)

Altamaha Green Energy is a 70.0 MW other interconnection project in Wayne County, Georgia with a current status of active. It is proposed to connect at Jessup – Ludowici Primary 115 kV TL.

70.0 MWCapacity
ActiveStatus
GAMarket
OtherTechnology

Project facts

Canonical nameAltamaha Green Energy
Queue IDGI-195
Statusactive
Source statusExecuted IA
MarketGA
TechnologyOther
Capacity70.0 MW
StateGeorgia
CountyWayne County
Point of interconnectionJessup – Ludowici Primary 115 kV TL
Requested (queue) date2024-08-20
Proposed in-service date2027-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.