Altita Solar (28INR0041)

Altita Solar is a 182.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at 138 kV Cotulla Substation (8610).

182.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameAltita Solar
Queue ID28INR0041
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity182.0 MW
State
County
Point of interconnection138 kV Cotulla Substation (8610)
Requested (queue) date2024-02-07
Proposed in-service date2028-05-15
Operational date
Withdrawn date
DeveloperACE DEVCO NC, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata