Altresco Increase (winter) (356)
Altresco Increase (winter) is a 160.0 MW gas interconnection project in Berkshire, Massachusetts with a current status of operational. It is proposed to connect at WMECO Doreen 19A substation.
160.0 MWCapacity
OperationalStatus
WMAMarket
GasTechnology
Project facts
| Canonical name | Altresco Increase (winter) |
|---|---|
| Queue ID | 356 |
| Status | operational |
| Source status | C |
| Market | WMA |
| Technology | Gas |
| Capacity | 160.0 MW |
| State | Massachusetts |
| County | Berkshire |
| Point of interconnection | WMECO Doreen 19A substation |
| Requested (queue) date | 2011-02-04 |
| Proposed in-service date | — |
| Operational date | 2012-06-29 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.