Amarillo South 115 kV (GEN-2023-209)

Amarillo South 115 kV is a 125.0 MW battery interconnection project in Randall, Texas with a current status of withdrawn. It is proposed to connect at Amarillo South 115 kV.

125.0 MWCapacity
WithdrawnStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameAmarillo South 115 kV
Queue IDGEN-2023-209
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyBattery
Capacity125.0 MW
StateTexas
CountyRandall
Point of interconnectionAmarillo South 115 kV
Requested (queue) date2023-10-02
Proposed in-service date2027-06-01
Operational date
Withdrawn date2025-09-09
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata