Amo-Edwardsport IGCC 345kV (J1548)

Amo-Edwardsport IGCC 345kV is a 200.0 MW solar interconnection project in Putnam, Indiana with a current status of withdrawn. It is proposed to connect at Amo-Edwardsport IGCC 345kV.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAmo-Edwardsport IGCC 345kV
Queue IDJ1548
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateIndiana
CountyPutnam
Point of interconnectionAmo-Edwardsport IGCC 345kV
Requested (queue) date2020-06-18
Proposed in-service date2024-06-01
Operational date2024-06-01
Withdrawn date2020-12-18
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata