Amsterdam Storage (22INR0417)
Amsterdam Storage is a 201.1 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at tap 345kV 43035 Oasis - 42500 Dow c27.
201.1 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Amsterdam Storage |
|---|---|
| Queue ID | 22INR0417 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 201.1 MW |
| State | — |
| County | — |
| Point of interconnection | tap 345kV 43035 Oasis - 42500 Dow c27 |
| Requested (queue) date | 2020-10-07 |
| Proposed in-service date | 2026-08-09 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Cottonwood Bayou II Storage, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata