Anawa La Solar (27INR0232)

Anawa La Solar is a 93.3 MW solar interconnection project in Hidalgo, Texas with a current status of operational. It is proposed to connect at TAP 138 KV 8394 LISTON - 8392 BATES .

93.3 MWCapacity
OperationalStatus
HidalgoMarket
SolarTechnology

Project facts

Canonical nameAnawa La Solar
Queue ID27INR0232
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHidalgo
TechnologySolar
Capacity93.3 MW
StateTexas
CountyHidalgo
Point of interconnectionTAP 138 KV 8394 LISTON - 8392 BATES
Requested (queue) date2024-03-29
Proposed in-service date
Operational date2027-08-31
Withdrawn date
DeveloperAnawa La Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata