Anthony Wayne Solar #1 (59489_AWS1)

Anthony Wayne Solar #1 is a 1.7 MW solar interconnection project in Lucas, Ohio with a current status of operational.

1.7 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameAnthony Wayne Solar #1
Queue ID59489_AWS1
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity1.7 MW
StateOhio
CountyLucas
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2014-06-01
Withdrawn date—
Developer—
Utility / transmission ownerToledo Zoological Society

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata