Appaloosa Run Wind (65335_WAPPA)

Appaloosa Run Wind is a 171.8 MW wind interconnection project in Upton, Texas with a current status of operational.

171.8 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameAppaloosa Run Wind
Queue ID65335_WAPPA
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity171.8 MW
StateTexas
CountyUpton
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2022-12-01
Withdrawn date
Developer
Utility / transmission ownerAppaloosa Run Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata