Appaloosa Run Wind (65335_WAPPA)

Appaloosa Run Wind is a 171.8 MW wind interconnection project in Upton, Texas with a current status of operational.

171.8 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameAppaloosa Run Wind
Queue ID65335_WAPPA
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity171.8 MW
StateTexas
CountyUpton
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2022-12-01
Withdrawn date—
Developer—
Utility / transmission ownerAppaloosa Run Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.