Apple BESS (69318_APPLE)

Apple BESS is a 9.9 MW battery interconnection project in Ector, Texas with a current status of active.

9.9 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameApple BESS
Queue ID69318_APPLE
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketERCO
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyEctor
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-09-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerApple, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2026-08-012026-09-01medium
2026-09-02proposed_online_date2026-07-012026-08-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata