Apple BESS (26INR0574)

Apple BESS is a 9.9 MW other interconnection project in Ector, Texas with a current status of active. It is proposed to connect at Station Name - Apple Oncor 5-digit code - APPLE Oncor XFMR # - 1 ERCOT Bus Name - APPLE_9 ERCOT Bus # 1276 EROCT Load Name - LDLXFMR1 Substation Transmission kV - 138.

9.9 MWCapacity
ActiveStatus
EctorMarket
OtherTechnology

Project facts

Canonical nameApple BESS
Queue ID26INR0574
Statusactive
Source status
MarketEctor
TechnologyOther
Capacity9.9 MW
StateTexas
CountyEctor
Point of interconnectionStation Name - Apple Oncor 5-digit code - APPLE Oncor XFMR # - 1 ERCOT Bus Name - APPLE_9 ERCOT Bus # 1276 EROCT Load Name - LDLXFMR1 Substation Transmission kV - 138
Requested (queue) date
Proposed in-service date2026-10-05
Operational date
Withdrawn date
DeveloperApple Infra LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.