Apricot Sun Solar (29INR0124)
Apricot Sun Solar is a 200.8 MW solar interconnection project in Duval, Texas with a current status of operational. It is proposed to connect at Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1.
200.8 MWCapacity
OperationalStatus
DuvalMarket
SolarTechnology
Project facts
| Canonical name | Apricot Sun Solar |
|---|---|
| Queue ID | 29INR0124 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Duval |
| Technology | Solar |
| Capacity | 200.8 MW |
| State | Texas |
| County | Duval |
| Point of interconnection | Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1 |
| Requested (queue) date | 2025-04-01 |
| Proposed in-service date | — |
| Operational date | 2029-09-30 |
| Withdrawn date | — |
| Developer | Apricot Sun Energy Center, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata