APV Plumwood Storage (24INR0285)

APV Plumwood Storage is a 200.8 MW other interconnection project in Chambers, Texas with a current status of operational. It is proposed to connect at Tap 138kV 40171 Baytown - 40015Cedar Bayou Plant.

200.8 MWCapacity
OperationalStatus
ChambersMarket
OtherTechnology

Project facts

Canonical nameAPV Plumwood Storage
Queue ID24INR0285
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketChambers
TechnologyOther
Capacity200.8 MW
StateTexas
CountyChambers
Point of interconnectionTap 138kV 40171 Baytown - 40015Cedar Bayou Plant
Requested (queue) date2022-03-30
Proposed in-service date
Operational date2029-10-01
Withdrawn date
DeveloperAPV Lonestar Energy LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.