Arana Creek Batt is a 153.5 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at 5648 Loyola 138kV.

153.5 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameArana Creek Batt
Queue ID21INR0507
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity153.5 MW
State
County
Point of interconnection5648 Loyola 138kV
Requested (queue) date2020-06-03
Proposed in-service date2026-05-31
Operational date
Withdrawn date
DeveloperArana Creek Battery Storage LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata