Aratina Solar Center 1B (61167_91MC8)

Aratina Solar Center 1B is a 80.0 MW solar interconnection project in San Bernardino, California with a current status of active.

80.0 MWCapacity
ActiveStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameAratina Solar Center 1B
Queue ID61167_91MC8
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketCISO
TechnologySolar
Capacity80.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnection
Requested (queue) date
Proposed in-service date2026-07-01
Operational date
Withdrawn date
Developer
Utility / transmission owner91MC 8me LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.