Arba Solar Energy Storage (64510_BAT1)

Arba Solar Energy Storage is a 5.1 MW battery interconnection project in Greene, North Carolina with a current status of operational.

5.1 MWCapacity
OperationalStatus
CPLEMarket
BatteryTechnology

Project facts

Canonical nameArba Solar Energy Storage
Queue ID64510_BAT1
Statusoperational
Source status(OP) Operating
MarketCPLE
TechnologyBattery
Capacity5.1 MW
StateNorth Carolina
CountyGreene
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-03-01
Withdrawn date—
Developer—
Utility / transmission ownerNorth Carolina El Member Corp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata