Archer Solar Project, LLC (018717)

Archer Solar Project, LLC is a 74.9 MW solar interconnection project in Alachua, Florida with a current status of withdrawn. It is proposed to connect at Archer Substation.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameArcher Solar Project, LLC
Queue ID018717
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyAlachua
Point of interconnectionArcher Substation
Requested (queue) date2017-05-16
Proposed in-service date2021-07-31
Operational date
Withdrawn date
DeveloperArcher Solar Project, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata