Arida Solar (Hybrid) (63841_BESS)

Arida Solar (Hybrid) is a 370.0 MW battery interconnection project in Clark, Nevada with a current status of active.

370.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameArida Solar (Hybrid)
Queue ID63841_BESS
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketCISO
TechnologyBattery
Capacity370.0 MW
StateNevada
CountyClark
Point of interconnection
Requested (queue) date
Proposed in-service date2029-06-01
Operational date
Withdrawn date
Developer
Utility / transmission owner326FW 8me LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata