Arland to Faraday 345 kV Line Tap (J3222)

Arland to Faraday 345 kV Line Tap is a 109.0 MW wind interconnection project in Moultrie, Illinois with a current status of withdrawn. It is proposed to connect at Arland to Faraday 345 kV Line Tap.

109.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameArland to Faraday 345 kV Line Tap
Queue IDJ3222
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity109.0 MW
StateIllinois
CountyMoultrie
Point of interconnectionArland to Faraday 345 kV Line Tap
Requested (queue) date2022-09-14
Proposed in-service date2025-09-15
Operational date2025-09-15
Withdrawn date2025-10-27
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.