Arlington Battery Energy Storage System is a 25.0 MW battery interconnection project in Snohomish, Washington with a current status of active.

25.0 MWCapacity
ActiveStatus
BPATMarket
BatteryTechnology

Project facts

Canonical nameArlington Battery Energy Storage System
Queue ID67669_ABESS
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketBPAT
TechnologyBattery
Capacity25.0 MW
StateWashington
CountySnohomish
Point of interconnection
Requested (queue) date
Proposed in-service date2026-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPUD No 1 of Snohomish County - (WA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata