Arlington Microgrid (G0593)

Arlington Microgrid is a 2.0 MW solar interconnection project in Snohomish, Washington with a current status of operational. It is proposed to connect at BPA's Murray Substation.

2.0 MWCapacity
OperationalStatus
WAMarket
SolarTechnology

Project facts

Canonical nameArlington Microgrid
Queue IDG0593
Statusoperational
Source statusENERGIZED
MarketWA
TechnologySolar
Capacity2.0 MW
StateWashington
CountySnohomish
Point of interconnectionBPA's Murray Substation
Requested (queue) date2018-06-26
Proposed in-service date
Operational date2019-06-21
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.