Armenia Mountain II (0221)

Armenia Mountain II is a 75.0 MW wind interconnection project in Bradford, Pennsylvania with a current status of withdrawn. It is proposed to connect at Homer City-Watercure 345kV.

75.0 MWCapacity
WithdrawnStatus
CMarket
WindTechnology

Project facts

Canonical nameArmenia Mountain II
Queue ID0221
Statuswithdrawn
Source status0
MarketC
TechnologyWind
Capacity75.0 MW
StatePennsylvania
CountyBradford
Point of interconnectionHomer City-Watercure 345kV
Requested (queue) date2006-07-19
Proposed in-service date2009-04-08
Operational date
Withdrawn date
DeveloperAES DE DEVCO NC LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata