Armstrong Project (L0663)

Armstrong Project is a 99.0 MW other interconnection project with a current status of active. It is proposed to connect at Allston Substation.

99.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameArmstrong Project
Queue IDL0663
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity99.0 MW
State
CountyColumbia
Point of interconnectionAllston Substation
Requested (queue) date2025-08-05
Proposed in-service date2025-08-11
Operational date
Withdrawn date
DeveloperColumbia River People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata