Columbia River People's Utility District — Interconnection Portfolio

Columbia River People's Utility District is associated with 10 tracked interconnection projects representing 2,176 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

10Projects
6Active
1Operational
3Withdrawn
2,176 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other102,176 MW

Geographic footprint

StateProjects
Oregon4
Washington3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
CAC Green H2 FacilityL0555Other1,600.0 MWwithdrawnColumbia, Washington
PARS - Betsy Johnson Substation (POD 4514)L0698Other240.0 MWactiveColumbia, —
Armstrong ProjectL0663Other99.0 MWactiveColumbia, —
PARS - St. Helens Substation (POD 3043)L0697Other70.0 MWactiveColumbia, —
Dutch Canyon SubstationL0593Other49.5 MWactiveColumbia, Washington
LNG Compressor LoadL0347Other40.0 MWwithdrawnColumbia, Oregon
Donald Nys SubstationL0592Other35.0 MWactiveColumbia, Washington
Deer Island SubstationL0463Other25.0 MWactiveColumbia, Oregon
B Johnson SubstationL0425Other11.0 MWwithdrawnMultnomah, Oregon
St.Johns-Allston InterconnectionL0295Other6.0 MWoperationalColumbia, Oregon

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor Columbia River People's Utility District's portfolio across all markets.

Start tracking with interXdata