Arrington Circuit 12.47 kV (AH2-138)

Arrington Circuit 12.47 kV is a 10.0 MW solar interconnection project in Nelson, Virginia with a current status of withdrawn.

10.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameArrington Circuit 12.47 kV
Queue IDAH2-138
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity10.0 MW
StateVirginia
CountyNelson
Point of interconnection
Requested (queue) date2022-02-28
Proposed in-service date2026-12-01
Operational date
Withdrawn date2025-04-06
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata