Arthur Kill Energy Storage 2 (0906)

Arthur Kill Energy Storage 2 is a 20.0 MW battery interconnection project in Ny, New York with a current status of withdrawn. It is proposed to connect at Fresh Kills Substation.

20.0 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameArthur Kill Energy Storage 2
Queue ID0906
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyNy
Point of interconnectionFresh Kills Substation
Requested (queue) date2019-08-28
Proposed in-service date2020-02-29
Operational date
Withdrawn date
DeveloperNRG Energy, Inc.
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata