Asbury 161 kV (GEN-2017-188)

Asbury 161 kV is a 130.0 MW solar interconnection project in Barry, Missouri with a current status of active. It is proposed to connect at Asbury 161 kV.

130.0 MWCapacity
ActiveStatus
MOMarket
SolarTechnology

Project facts

Canonical nameAsbury 161 kV
Queue IDGEN-2017-188
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketMO
TechnologySolar
Capacity130.0 MW
StateMissouri
CountyBarry
Point of interconnectionAsbury 161 kV
Requested (queue) date2017-11-30
Proposed in-service date2026-06-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata