Barry County, Missouri — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Barry, Missouri, representing 285 MW of requested capacity.
3Total projects
1Active
0Operational
2Withdrawn
285 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 210 MW |
| Battery | 1 | 75 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Asbury 161 kV | GEN-2017-188 | Solar | 130.0 MW | active | Barry, Missouri |
| Reeds Spring-Aurora 161kV Line | GEN-2019-035 | Solar | 80.0 MW | withdrawn | Barry, Missouri |
| Monett 161 kV Substation | GEN-2023-234 | Battery | 74.9 MW | withdrawn | Barry, Missouri |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Barry County.
Start tracking with interXdata