ASG-2 Community Solar (69103_ASG-2)

ASG-2 Community Solar is a 5.0 MW solar interconnection project in Sandoval, New Mexico with a current status of operational.

5.0 MWCapacity
OperationalStatus
PNMMarket
SolarTechnology

Project facts

Canonical nameASG-2 Community Solar
Queue ID69103_ASG-2
Statusoperational
Source status(OP) Operating
MarketPNM
TechnologySolar
Capacity5.0 MW
StateNew Mexico
CountySandoval
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-12-01
Withdrawn date
Developer
Utility / transmission ownerAffordable Solar Silver City, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata