Sandoval County, New Mexico — Interconnection Projects
The interXdata warehouse tracks 19 interconnection projects in Sandoval, New Mexico, representing 506 MW of requested capacity.
19Total projects
1Active
12Operational
3Withdrawn
506 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 14 | 301 MW |
| Wind | 1 | 102 MW |
| Battery | 1 | 58 MW |
| Gas | 3 | 45 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| TAG | 67710_TAGS1 | Solar | 140.0 MW | operational | Sandoval, New Mexico |
| Red Mesa Wind LLC | 57357_EXIS | Wind | 102.4 MW | operational | Sandoval, New Mexico |
| TAG | 67710_TAGB1 | Battery | 57.8 MW | operational | Sandoval, New Mexico |
| Encino Solar Energy Center | 63860_ESEC | Solar | 55.0 MW | operational | Sandoval, New Mexico |
| NMRD Data Center III, LLC | 66287_NMRD3 | Solar | 50.0 MW | operational | Sandoval, New Mexico |
| Algodones | 2475_3 | Gas | 15.0 MW | suspended | Sandoval, New Mexico |
| Algodones | 2475_1 | Gas | 15.0 MW | suspended | Sandoval, New Mexico |
| Algodones | 2475_2 | Gas | 15.0 MW | suspended | Sandoval, New Mexico |
| West Queue Project SGI-PNM-2016-03 — Solar in Sandoval, New Mexico | SGI-PNM-2016-03 | Solar | 10.0 MW | withdrawn | Sandoval, New Mexico |
| West Queue Project SGI-PNM-2016-02 — Solar in Sandoval, New Mexico | SGI-PNM-2016-02 | Solar | 10.0 MW | withdrawn | Sandoval, New Mexico |
| West Queue Project SGI-PNM-2013-03 — Solar in Sandoval, New Mexico | SGI-PNM-2013-03 | Solar | 9.0 MW | operational | Sandoval, New Mexico |
| Sandoval Solar Energy Center | 59558_SSEC1 | Solar | 6.1 MW | operational | Sandoval, New Mexico |
| SLO-2 | 69105_SLO-2 | Solar | 5.0 MW | active | Sandoval, New Mexico |
| ASG-2 Community Solar | 69103_ASG-2 | Solar | 5.0 MW | operational | Sandoval, New Mexico |
| West Queue Project SGI-PNM-2021-23 — Solar in Sandoval, New Mexico | SGI-PNM-2021-23 | Solar | 5.0 MW | withdrawn | Sandoval, New Mexico |
| Cuba 2.5ac, LLC | 64903_SOLAR | Solar | 2.5 MW | operational | Sandoval, New Mexico |
| City of Rio Rancho WWTP | 63391_CORR | Solar | 1.2 MW | operational | Sandoval, New Mexico |
| Rio Rancho High School | 58589_RRHS | Solar | 1.0 MW | operational | Sandoval, New Mexico |
| Sue Cleveland High School | 58588_SCHS | Solar | 1.0 MW | operational | Sandoval, New Mexico |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Sandoval County.
Start tracking with interXdata