ASGI-2010-020 is a 30.0 MW wind interconnection project in Lovington, New Mexico with a current status of operational.

30.0 MWCapacity
OperationalStatus
NMMarket
WindTechnology

Project facts

Canonical nameASGI-2010-020
Queue IDASGI-2010-020
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketNM
TechnologyWind
Capacity30.0 MW
StateNew Mexico
CountyLovington
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-06-01
Withdrawn date
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.