Lovington County, New Mexico — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Lovington, New Mexico, representing 764 MW of requested capacity.

6Total projects
0Active
5Operational
1Withdrawn
764 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2650 MW
Wind372 MW
Other142 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Hobbs - Yoakum 345 kV LineERAS-2025-020Solar400.0 MWoperationalLovington, New Mexico
Tuco-Yoakum-Hobbs 345 kVGEN-2020-059Solar250.0 MWwithdrawnLovington, New Mexico
ASGI-2010-010ASGI-2010-010Other42.2 MWoperationalLovington, New Mexico
ASGI-2010-020ASGI-2010-020Wind30.0 MWoperationalLovington, New Mexico
ASGI-2011-001ASGI-2011-001Wind27.3 MWoperationalLovington, New Mexico
ASGI-2010-021ASGI-2010-021Wind15.0 MWoperationalLovington, New Mexico

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Lovington County.

Start tracking with interXdata