ASGI-2010-021 (ASGI-2010-021)

ASGI-2010-021 is a 15.0 MW wind interconnection project in Lovington, New Mexico with a current status of operational.

15.0 MWCapacity
OperationalStatus
NMMarket
WindTechnology

Project facts

Canonical nameASGI-2010-021
Queue IDASGI-2010-021
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketNM
TechnologyWind
Capacity15.0 MW
StateNew Mexico
CountyLovington
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-12-30
Withdrawn date—
Developer—
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata